[SMM Analysis] Natural graphite trade cooled down in May 2025, with a continued decline expected in June

Published: Jul 16, 2025 09:44
[SMM Analysis: Natural Graphite Trade Cools Down in May 2025, Expected to Continue Declining in June] SMM reported on July 16: In May 2025, China's flake graphite exports stood at 8,716 mt, down 3% MoM and 10% YoY.

》Check SMM's cobalt and lithium product quotes, data, and market analysis

》Subscribe to view historical price trends of SMM's cobalt and lithium product spot cargo

SMM News on July 16, 2025:

In May 2025,China's imports of flake graphite reached 4,853 mt, showing a 16% decline MoM and a 5% increase YoY.

Source: SMM, China Customs

In May 2025,China's exports of flake graphite reached 8,716 mt, down 3% MoM and 10% YoY; China's exports of spherical graphite reached 3,373 mt, down 39% MoM and 24% YoY.

Source: SMM, China Customs

Source: SMM, China Customs

In May 2025, the natural graphite market was affected by many uncertainties in the international trade environment, showing an overall wait-and-see attitude. Both upstream and downstream enterprises in the natural graphite industry chain at home and abroad were cautious about market trends, slowing down the pace of procurement, production, and import and export activities. This widespread wait-and-see sentiment was directly reflected in trade data, leading to a significant decline in the import and export volumes of flake graphite and the export volume of spherical graphite compared to the previous month.
Looking ahead to June, from the perspective of the market cycle, with the cancellation of mandatory energy storage allocation and the end of the auto show in June, the production pace of downstream battery cell enterprises has slowed down, naturally reducing the demand for natural graphite. Therefore, it is expected that the import and export volumes of flake graphite and the export volume of spherical graphite will continue to decline in July.


SMM New Energy Research Team

Wang Cong 021-51666838

Ma Rui 021-51595780

Feng Disheng 021-51666714

Lv Yanlin 021-20707875

Zhou Zhicheng 021-51666711

Zhang Haohan 021-51666752

Wang Zihan 021-51666914

Wang Jie 021-51595902

Xu Yang 021-51666760

Xu Mengqi 021-20707868

Hu Xuejie 021-20707858

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
6 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
6 hours ago